| http://www.w3.org/ns/prov#value | - On December 29, 2010 during final tests of the dam consisting to raising the reservoir level to the spillway crest, three concrete blocks of the spillway collapsed causing large damages in the territory downstream mainly to agriculture, infrastructures and other constructions (over 100 millions of euros of economic losses), luckily without casualties thanks also to timely action of the national/re
|