PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • However, because of various reasons, including water shortage, the corporation generates only 600 to 700 MW. At the moment the power deficit is 80 MW.EEPCo is undertaking massive hydropower projects: Gibe II (420 MW), Gibe III (1,870 MW), Tekeze (300 MW), Beles (460 MW) and Fincha Amenti Neshe (100 MW).
http://www.w3.org/ns/prov#wasQuotedFrom
  • tunnelbuilder.com