| http://www.w3.org/ns/prov#value | - Traffic circulation moves along a helix-shaped ramp that wraps this central void.Some 1,600 cubic yards of concrete were used in the structure, including drilled piers, columns, basement walls, slab-on-grade, grade beams, and elevated post-tensioned slab and beams.
|