| http://www.w3.org/ns/prov#value | - Vehicle planning including a philosophy and concept for the planned vehicle is carried out in S51-S56 (Steps 51-56) in FIG. 31, but when the gap value calculated in FIG. 37, S61 (Step 61) is large, the operator will need to take some measure, such as changing specifications or systems, for example.
|