| http://www.w3.org/ns/prov#value | - Alternatively, during drilling in which the detector is moved by a drill string, particularly one including drill pipe sections, an extrapolation can be made from the last known position based on extension of the drill string and, if measured, known pitch and yaw to obtain a better initial estimate.
|