| http://www.w3.org/ns/prov#value | - The highest level of risk associated with a procedure, problem, or management option determines the level of risk.Only two of the three elements need to meet or exceed the level of decision-making which is selected.If the level of history is counted as one of the two key components, for example a problem focused (PF) history, this is all that is required for the documentation of a CPT 99212.You mu
|