http://www.w3.org/ns/prov#value | - This was accomplished using a land-based grout mixer and pump that delivered grout to the construction barge 300 feet offshore, where the crane was used to suspend a 330-foot-long tremie grout pipe to deliver grout to the bottom of the pile sockets.The structure began operating in December 2009.Operations during constructionIt cost $112 million to develop this structure, including design and const
|