PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • The ESIA should also describe the environmental management system (EMS) to be implemented. ??? Closure of the site Rehabilitation across the whole area affected by the cement manufacturing footprint, with special emphasis on managing hazardous areas and materials, and End of life monitoring, particularly to measure diffuse low level contamination in soil or ground water (required by legislation in
http://www.w3.org/ns/prov#wasQuotedFrom
  • docstoc.com