| http://www.w3.org/ns/prov#value | - The RWQCB's 83-13 calling for all discharges to cease by such and such a date is an attempt to reduce the nitrate load to the BASIN. At the same time, a sewer plant will be allowed to discharge treated wasetwater with 7mgl of nitrates back into the BASIN. (Clearly, he is not zero discharge.) So, the question, if you are attempting to reduce nitrates in the upper aquifer by reducing nitrates discha
|