| http://www.w3.org/ns/prov#value | - When the test strip is inserted in the strip connector, the data acquisition system applies at least a first voltage between the working and counter electrodes and measures any resulting current flowing between the working and counter electrodes, applies at least a second voltage between the fill-detect electrodes and measures any resulting current flowing between the fill-detect electrodes, and m
|