http://www.w3.org/ns/prov#value | - The lot dispatching method according to claim 6, further comprising checking whether the measured value of respective first lots with respect to the inspection item satisfies a control standard to judge whether the first lots are to be handled in accordance with the lot dispatching method, wherein a product standard is an external standard for judging whether a lot is defective or non-defective wi
|