| http://www.w3.org/ns/prov#value | - When treating foundations deeper than 4 feet, apply the termiticide as the backfill is being replaced, or if the construction contractor fails to notify the applicator to permit this, treat the foundation to a minimum depth of 4 feet after the backfill has been installed. the applicator must trench and rod into the trench or trench along the foundation walls and around pillars and other foundation
|