| http://www.w3.org/ns/prov#value | - This project includes construction of a 100 square foot building constructed of CMU block with wood trusses and metal roofing system; installation of disinfection equipment including, metering pumps, valve board assembly, chemical drum scales, and water quality equipment; installation of a chemical injection vault and other site and utility improvements; installation of electrical and telemetry eq
|