http://www.w3.org/ns/prov#value | - The vessel is a 273,000-dwt tanker built in 1974, and the project consists of two major parts: the refurbishment of the vessel and the conversion to provide the required functions of the FSO. The major work includes: the installation of a purpose-built extension on the vessel's bow that will support the station keeping turret mooring system; the fabrication and installation of a helideck and a new
|