PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • he public stadium authority, in consultation with the team affiliate, shall have the authority to make the final determination of the stadium and exhibition center overall design and specification; (4) The public stadium authority shall have the authority to contract with a team affiliate for the provision of architectural, engineering, environmental, and other professional services related to the
http://www.w3.org/ns/prov#wasQuotedFrom
  • wa.gov