PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • The construction process comprises the steps of: providing a retaining mold, such as a trench or other conventional mold for forming a concrete footing, for retaining a concrete slurry; installing reinforcing rods within the retaining mold in a manner such that vertical dowels extend upwardly past the retaining mold; at least partially filling the retaining mold with a concrete slurry mixture in a
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.com