| http://www.w3.org/ns/prov#value | - So we chose the location in the middle of the accumulation zone of the slide, where movement is around let???s say 1-3 cm per year and quite horizontal, made the whole underground structure be one fat concrete box that ???swims??? in the mass, and thought of all conduits and such things as something that has to offer flexibility or to be changed after a few years.
|