| http://www.w3.org/ns/prov#value | - hich an initial cable route is identified and the physical and human risks are assessed,??? he explained. ???That study becomes the basis for a physical survey of the seabed to identify any existing obstacles like wreck sites or existing infrastructure such as pipelines and other cables in the vicinity.??????Only after these activities have been completed will a final route plan be determined by o
|