PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • Planning and engineering of the production line including selection of the optimum technology and fab designFeasibility studies and business plans for installation and operationFacility consulting, in particular with regard to chemical supplies, ultrapure water and other media (facility engineering)Project planning and managementInstallation, start-up and ramp-up of production equipment and automa
http://www.w3.org/ns/prov#wasQuotedFrom
  • centrotherm-pv.com