| http://www.w3.org/ns/prov#value | - But this means that all the way through everyone will know that you need to specify a pump, and if it isn???t specified and costed, it???ll be easy to see that there???s still a gap in the budget.???This type of planning requires a degree of co-operation between design, engineering, purchasing and other departments, which hadn???t existed before, Stokes said. ???Making these sorts of detailed plan
|