| http://www.w3.org/ns/prov#value | - Further, although the flow chart in FIG. 7 refers to ???workers,??? it should be understood that a resource could be any asset used to perform a task, such as equipment, transportation devices, etc., for example. [0071] In general, once the simulation model has been defined; it is optimized by specifying decision variables (i.e., a tasks or resource parameters) of the simulation model, defining an
|