| http://www.w3.org/ns/prov#value | - Gulf Power claimed its poles were at ???full capacity??? and that it had buyers ???waiting in the wings??? willing to pay a higher rate, the two circumstances the 11th Circuit held were both necessary before a pole owner could collect pole rents above marginal cost (the 11th Circuit as well as the FCC and other commissions have held that the cable formula already produces rates above marginal cost
|