PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • Is it permissible to make the bond at this latter position, and if so, how should such a deviation be recorded?Answer: Regulation 547-02-02 mentions that the connection shall be as near as practicable to the point of entry of that service to the premises, and that where there is an insulating section, that it be made to the hard metal pipework and before any branch pipework.
http://www.w3.org/ns/prov#wasQuotedFrom
  • voltimum.co.uk