http://www.w3.org/ns/prov#value | - The buildings shall not have aluminum or other metal siding, or shielded wiring (e.g.: wiring installed through conduit, or BX electric cable). 3) Measurements shall be made at positions around the building perimeter where the maximum emissions occur.
|