http://www.w3.org/ns/prov#value | - existing bogs and the excavation of sand from sand pits; c. the repair and reconstruction of water control structures including flumes, pumps, dikes, and piping above and below the ground; d. the regrading, including modification of drainage, and replanting of existing cranberry bogs; e. the repair and replacement of dikes; f. water harvesting activities; and g. flooding and flood release; 14. the
|