| http://www.w3.org/ns/prov#value | - 6.T.4.3Best Management Practices (BMPs).(See also Part 4.2.7.2) In addition to the other BMPs considered, consider the following: routing storm water to the treatment works; or covering exposed materials (i.e., from the following areas: grit, screenings and other solids handling, storage or disposal areas; sludge drying beds; dried sludge piles; compost piles; septage or hauled waste receiving sta
|