  • ???Review and check documents for Operation???Interface Coordinator (Battery limit, Tie-in, Financial Risk Analysis and Construction Schedule interfacing) to secure work permits???Prepare / generate permit to work (PTW) ??? check the Method Statements, Job Safety Analysis, drawings and other documents needed in the PTW to comply with the QP-RLIC Approval Letters???Perform inspection work location