| http://www.w3.org/ns/prov#value | - For example, runoff from the lower portions of the watershed should be allowed to pass downstream without delay (as long as the downstream floodway is capable of handling these flows), while runoff from the central and headwater sections of the watershed should be slowed or held back using natural features such as wetlands and floodplains to minimize peak flow rates.
|