PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • (1) Following the date on which the initial performance test is completed or is required to be completed under ?? 60.2125, whichever date comes first, ensure that the affected facility does not operate above the maximum charge rate, or below the minimum secondary chamber temperature (if applicable to your CISWI unit) or the minimum reagent flow rate measured as 3-hour block averages at all times.
http://www.w3.org/ns/prov#wasQuotedFrom
  • federalregister.gov