PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • First stud openings, are generally formed in two successive etching steps, using two different masks: GS and CA. After a two-step cleaning, a photoresist adhesion promoter such as HMDS is applied onto the structure (prebake time: 7 mn), followed by standard photoresist, (e.g. the e-MERCK resin), preferably, with MTI MULTIFAB equipment, and baked.
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.com