| http://www.w3.org/ns/prov#value | - To assure that the integrity of frontal seal surfaces 11 and 26 are not violated during the final phases of fabrication, storage, transportation and handling at the well site, a variety of different types of protector caps and plugs or clamp-on protectors are installed on the ends of drill pipe adapters 1 and 16.
|