| http://www.w3.org/ns/prov#value | - A modification of the certificate of need is not required for this project because the cost does not exceed the 15% plus inflation allowed (the original cost was $1.7 million); the original CON application and review document both acknowledged the need for additional stations in the future and allowed the project to be designed to meet those need; and there is a cost savings for adding the additio
|