| http://www.w3.org/ns/prov#value | - Completion of all permits and environmental studies (PA&ED) Preparation of plans, specifications and estimates. (PS&E) The acquisition of rights-of-way. (R/W Support) Construction management and engineering, including surveys and inspection. (Construction Support) These estimates are summarized in the Capital and Support Cost Summary Table, previously called the SB45 table
|