http://www.w3.org/ns/prov#value | - by Maury Markowitz (452832) writes: > The watts per square meter are still very low, the panels very expensive, the land and installation requirements still onerousAll-in, including land, clearing it, levelling it, installing equipment, trenching lines, all CAPEX and REG, every single penny from one end to the other, costs $1.79 a Watt.In comparison, fission plants are currently going in for at le
|