PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • but not below the original cost as submitted by the Funding Developer and approved by the City Engineer.) The original cost of the right-of-way and design and construction shall mean the cost of right-of-way acquisition, financing, engineering, construction and any other costs actually incurred which are directly attributable to the improvements, including any costs incurred for the formation or a
http://www.w3.org/ns/prov#wasQuotedFrom
  • colocode.com