http://www.w3.org/ns/prov#value | - No building shall be razed except by permit from the Zoning Administrator, who is authorized to require a performance bond, the amount of which is to be one hundred percent (100%) of the cost of demolition and removal of materials determined by the Zoning Administrator.
|