| http://www.w3.org/ns/prov#value | - e wiring, same circuitry, a little bit more earthquake resistant and we can survive a lot of bad earthquakes. so why do not we do that? >> the oppositions are systemic particularly the northeast. you have to undergo 10 to 15 years of litigation in order to get a new pipeline, a new transmission line in. they were all below the level that required significant environmental review. i got 10 done that
|