| http://www.w3.org/ns/prov#value | - This strategy allowed a 35-ton Timberland derrick mounted on the roof of One57 to have enough clearance to hoist the boom into position.Crews then brought up smaller components, such as the cab, rotating gear, counterjib, counterweights, winches and other parts needed to operate the crane.
|