http://www.w3.org/ns/prov#value | - Sealed at the factory, including fuel for its 10-year operational lifetime, the Gen4 Module (previously the Hyperion Power Module) will require no refueling and no on-site access to nuclear fuel (vastly reducing safety and proliferation concerns).
|