PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • As the collar annulus fills with cement from the egress valve 35, downhole formation fluids, drilling fluids and other debris is forced from the collar annulus 20 through the screen 90 and into the ingress orifice 66 until the cement reaches the screen 90.
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.com