http://www.w3.org/ns/prov#value | - ???based on the current M&R Facility (ed. note: Metering & Regulation) design, all wiring and electrical components such as generators would be located at least 1 foot above the current floor elevation ??? This is expected to limit risk of significant equipment damage due to flooding ??? ???
|