| http://www.w3.org/ns/prov#value | - Consistent with that purpose, a production reactor would have built-in refueling capability, including lifting devices, crane, transfer facilities, a refueling deck, and pool for temporary storage of the irradiated fuel before it is shipped to a reprocessing facility.
|