| http://www.w3.org/ns/prov#value | - FIG. 19 is a timing chart which shows an operation of charge pump circuit 220 according to input signal A and input signal B. As shown in FIG. 19, while rising edge of input signal B is behind rising edge of input signal A, up-signal UP is activated and supplies node N1 with constant current I0 (+I0).
|