PropertyValue
http://www.w3.org/1999/02/22-rdf-syntax-ns#type
http://www.w3.org/ns/prov#value
  • In the event that the downstream circuit breaker 14 nearest the fault is unable to clear the fault, the next upstream circuit breaker will attempt to clear the fault with minimal additional delay based upon its modified dynamic delay time.
http://www.w3.org/ns/prov#wasQuotedFrom
  • google.ca