| http://www.w3.org/ns/prov#value | - The scheduler's job is thus a never-ending job of puzzling together an optimum schedule with minimum side trim waste, in a manner that allows the corrugator to run continuously, and subject to a number of variables, including board grade, paper width, blank width, and total lineal length.
|