| http://www.w3.org/ns/prov#value | - Continuing with FIGS. 1 and 2, the steps of the self test sequence is as follows; Verify the fault detector is reporting no fault; Induce a fault; Verify the fault detector reports a fault; Deactivate fault inducer; Verify the fault detector no longer reports a fault; Verify that the main relay is in its on position; Verify that the auxiliary relay is in its off position; Verify that load power is
|