| http://www.w3.org/ns/prov#value | - The other two categories were: viability, or the likelihood of achieving the proposed commercial operation date; and ability to improve reliability of the electric system in Connecticut, with considerations for contributions to improved transmission, local sourcing requirements, meeting peak demand and other technical requirements.
|