| http://www.w3.org/ns/prov#value | - Track-circuiting is mandatory in sections where visibility is a problem, shunting operations are routinely carried out on the block section outside station limits on the main running line, or if special situations exist, e.g., if the advanced starter is more than one full train-length ahead of the most advanced trailing points of the station.
|