| http://www.w3.org/ns/prov#value | - d operational and maintenance costs, such as the costs of required airborne refueling due to range shortfalls. (2) A schedule for securing from the contractor, in accordance with the terms of existing C-17 contracts, an equitable recovery for the operational impacts caused by deficiencies in the range/payload specification identified in the analysis required by this section. (d) REPORT CONTENTS- E
|