| http://www.w3.org/ns/prov#value | - Further prior to the control of superheat and temperature, i.e. before the refrigerating apparatus concerned is brought into refrigeration operation, a refrigerant selecting circuit feeds a refrigerant specifying signal to an initial valve opening signal generator, while a load capacity selecting circuit gives the generator a load capacity signal specifyinq the size of the space to be cooled.
|